FAQ >> Security requirements for crane hooks
Security requirements for crane hooks
Safety Inspection hook
- Human-driven hoisting mechanism with a hook, to 1.5 times the rated load test as the test load.
- Power-driven hoisting mechanism used to hook to 2 times the rated load test as the test load.
- After the inspection shed load hook, without any obvious defects, and deformation, the opening degree of the increase should not exceed 0.25% of original size.
- Inspection of the hook, the hook should be in the low stress zone marking, including the rated capacity, factory standard, or make, inspection mark, the production number and so on.
Relative FAQ
- General requirements of the safe operation of crane drivers
- Safety Rules for Construction Site Workers
- Metallurgical cranes on the technical requirements for special work
- The Manufacturing Process Of Crane
- Bridge and gantry cranes
- Heavy Duty Jib Cranes
- News conference addresses concerns over tower crane safety
- Introduction of overhead crane operator
- Self-Raising Tower Crane
- Gantry crane introduce
Relative Products
- Beauty Spa Equipment
- Side lift crane
- Diode laser equipment
- Gantry crane
- Truck mounted crane
- port crane
- Electric dust collector
- Bulk-handling crane
- Floating crane
- Water and Oxygen Jet Machine
- Dedusting & ash conveying
- Bridge Crane
- Fire Rated Steel Door
- Er:bium Glass fractional laser
- E-energy Breast Beautifying Laser
Contact Us
Email: sales@bossbuyer.com
Skype: bossbuyer
Market Hotline
0086-21-61435-919
Service Hotline:
0086-21-61435-919