FAQ >> Information Required to Determine the mill size accurately
Information Required to Determine the mill size accurately
The following information is required to determine the mill size accurately.
GRINDING MILL INFORMATION SHEET
1.Material To Be Ground
2.Material Characteristics
3.% Moisture In Feed
4.Grinding Index (if known)
5.Density of Feed Lbs./Cu. Ft.
6.Specific Gravity
7.Desired Capacity (Dry Solids Per Hour)
8.% Solids and/or Pulp Density
9.Feed Size – Maximum Size
80% Passing Size
10.Product Size – 80% Passing Size
11.Type of CircuitWetDry
OpenClosed
Additional information: (Available Power, Type of Drive Preferred, etc.)
Relative FAQ
- Introduction of overhead crane operator
- Security requirements for crane hooks
- Stationary or mobile concrete plants and concrete mixing plant
- Popular Construction Equipments or Construction Machineries
- Single-girder overhead travelling cranes with the new Demag DR rope hoist
- Workstation Jib Cranes
- Question About Tower Crane - 3
- Classification of Crane Anti-sway devices
- Active Sway Suppression Techniques of a Gantry Crane System
- Principle of the Crane Anti-Sway device
Relative Products
- Rough terrain crane
- Concrete mixing plant
- Combine harvester
- Construction Scrapers
- Flotation Machine
- Hammer Crusher, Hammer Mill
- Articulated truck
- CO2 Fractional Laser
- Er:bium Glass fractional laser
- Slimming Machine
- Beauty Spa Equipment
- E-energy Breast Beautifying Laser
- IPL Beauty Machine
- Q-switched ND YAG Laser
- Dedusting & ash conveying
Contact Us
Email: sales@bossbuyer.com
Skype: bossbuyer
Market Hotline
0086-21-61435-919
Service Hotline:
0086-21-61435-919